icon images

Tender Documents

We help write and manage Tender Documents, contract or tender documents in construction industry are an agreement between two parties which they intend to be legally binding with respect to the obligations of each party to the other and their liabilities

icon images

Building Control Services

According to the Construction Health and Safety to protect people's health and safety in the built environment. This involves, among other things, enforcing the following legislation: The Building Act 1984. The Building Regulations and other allied legislation.

icon images

Structural Designs and Calculations

We do the math behind your building's ability to stay upright. The engineers use them to determine the loads that a building must withstand and the properties of members that comprise its structure

icon images

Project Management

We oversee all phases of the initial design process all the way to the construction process, making sure the project is completed on time and within scope and budget. This role works closely with architects and engineers to develop plans, establish timelines and calculate labor and material costs.

icon images

Party Wall

We can help design a Party Wall along a property line dividing two terraced houses, so that one half of the wall's thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. Planning permission is not required to serve a party wall notice and, because you will have up to a year to start work once the notice has been served, it is a good idea to do this as soon as possible in order to avoid delays.

icon images

Permitted Development Rights

We apply for Permitted development rights, which are a national grant of planning permission which allow certain building works and changes of use to be carried out without having to make a planning application. In this case there is no waiting time of eight weeks.