icon images

Planning Appeal

In case of a Planning Permission having been rejected b y the authorities, where there is a dispute between the applicant and the planning authority whether sufficient information has been supplied to register and determine a planning application.

icon images

Feasibility Study

We also specialise in carrying out an assessment of whether the project will be feasible. The purpose of feasibility studies is to establish whether the project is financially or practically viable.

icon images

Mechanical and Electrical Designs

We can include and tailor in Mechanical and Electrical designs which can include elements of electrical infrastructure,, heating and ventilation and any other electrical appliances and instruments.

icon images

Planning Application

We apply for Planning permission or developmental approval which refers to the approval needed for construction or expansion, and sometimes for demolition, in some jurisdictions. It is usually given in the form of a building permit. Waiting times for the application are around eight weeks.

icon images

Building Regulation Drawings

Our services also include Building Regulation Drawings, which are a set of detailed drawings and construction details that are submitted to the local building control department and go into much more detail than the planning application drawings.

icon images

Building Control Services

According to the Construction Health and Safety to protect people's health and safety in the built environment. This involves, among other things, enforcing the following legislation: The Building Act 1984. The Building Regulations and other allied legislation.